Installation; Appliance Preparation - Valor LT1 2500KN Installation Manual

Direct vent zero clearance gas fireplace
Table of Contents

Advertisement

Installation

Unpack Appliance
Beware of sharp edges! Wear gloves!
1. Unpack the appliance and all material around it.
2. Unpack any loose items from around the appliance.
3. Remove vertical crating walls.
4. Unscrew the 4 tabs retaining the appliance to the
pallet.
5. Bend the retaining tabs up, fl ush against the appliance
(unless you plan to screw the unit to the cavity fl oor
upon installation).
6. Remove the window and set aside in a safe place to
avoid damage—see page 30.
7. Remove all items packed inside the appliance.
8. Verify that you have all the components required
for the installation using the Pack Content List,
including:
• unit vent elbow (in separate box within unit);
• HeatShift system components;
• approved non-combustible board (not included);
• liners and fuel bed (in separate cartons);
• trim kit with barrier screen;
• other venting components and accessories;
• electrical components.
9. Recycle or safely dispose of all removed packing mate-
rials.

Appliance Preparation

29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lt1 2500kp

Table of Contents