a1 and b1 Test
Figure 4-3
Operation
Operator's Check
3. Loosely connect the RF source cable to the power splitter as shown in
Figure 4-3
below. Connect the other end of the RF source cable to the
output of the source. Rotate the semi-rigid cables to the required position
for connection to ports a
Hardware Configuration for Operator's Check
4-4 Agilent 8511B Test Set Operating and Service Manual
1
and b
. Tighten all connections.
1