Download Print this page

Du Pont SORVALL RC-5 Service Manual page 183

Automatic superspeed refrigerated centrifuges

Advertisement

Sorvall®
Centrifuges
Maintenance
&
Repaird.
Checking
Refrigerant
Charge1.
Prepare
the
centrifuge
by
running
the
SS-34
rotor
at
20
000
rpm
for
about
30
min¬utes
with
the
RUN
cycle
temperature
control
(blue
set
pointer)
at
-3°C.
The
ambientroom
temperature
should
be
about
25°C.2.
Connect
a
System
Analyzer
to
the
HIGH
and
LOW
service
ports
and
check
thecharge
at
the
HIGH
and
LOW
pressure
ports.
Gauge
pressure
should
be
in
the
fol¬lowing
ranges
for
the
RC-5
and
RC-5B:HIGH
Pressure
Side:
195
to
240
psiLOW
Pressure
Side:
8
to
12
psiCompressorCurrent
Draw:
10
-
13Ae.
Leak
Detection1.
With
the
system
in
operation,
use
an
electronic
leak
detector
in
accordance
withmanufacturer's
instructions.2.
If
necessary,
normal
shop
techniques
using
a
concentration
of
water
and
soap
areeffective.f.
Evaporator
Liner
Cleaning1.
After
removing
the
condensing
assembly
(paragraph
6-13).
remove
the
filter
drierfrom
the
HIGH
pressure
side
fitting.2.
Using
liquid
refrigerants
11
or
113,
flush
the
evaporator
liner
through
the
HIGHpressure
side
fitting
into
the
capillary
tubing
through
the
evaporator
and
out
theLOW
pressure
side
suction
tubing.
Refrigerant
502
may
be
used
as
a
refrigerantpressure.3.
Use
a
white
cloth
or
soft
paper
to
monitor
the
flushing.
When
the
system
is
clean,flush
the
system
with
dry
refrigerant
502.6-45/6-46

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Sorvall rc-5b