Download Print this page

Du Pont SORVALL RC-5 Service Manual page 177

Automatic superspeed refrigerated centrifuges

Advertisement

Sorvall®
Centrifuges
Maintenance
&
Repair2.
Installationa.
Secure
mounting
brackets
to
M102
in
three
places
with
nuts
and
lockwashers,leaving
lower
left
nut
and
lockwasher
off.b.
Install
M102
in
the
console,
then
secure
the
brackets
with
four
screws
andlockwashers.c.
If
cable
clamp
is
available,
secure
it
to
the
lower
left
bracket
with
nut.
lock-washer.
and
flat
washer.d.
Remove
the
shorting
bar
from
the
M102
terminals.e.
Using
the
terminal
nuts,
secure
the
(+)
and
(—)
wires
to
the
(+)
and
(—)
termi¬nals
of
M102.
respectively.f.
Align
the
key
and
fully
seat
connector
J105.g.
Install
and
secure
the
set-pointer
knobs
with
the
setscrews.h.
Install
the
console
rear
panel.i.
Calibrate
in
accordance
with
Table
7-1.p.
Timer
(S106
and
S107)1.
Removala.
Set
main
circuit
breaker
to
OFF.b.
Unplug
power
cord
from
the
socket.c.
Remove
console
rear
panel.d.
Disconnect
connector
PI
03
at
rear
of
timer.e.
Tag.
then
remove,
all
terminated
wires.f.
Loosen
two
setscrews.
then
remove
skirted
knob.g.
Remove
nut
and
lockwasher
from
timer
shaft
in
front
of
console
and
removetimer
from
rear
of
console.2.
Installationa.
Install
the
timer
from
the
rear
of
the
console
through
the
alignment
hole
in
thepanel
with
switches
facing
downward
and
key
way
on
the
shaft
facing
down¬ward.b.
Secure
the
timer
with
the
nut
and
lockwasher.6-39

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Sorvall rc-5b