Download Print this page

Du Pont SORVALL RC-5 Service Manual page 161

Automatic superspeed refrigerated centrifuges

Advertisement

Sorvall®
Centrifuges
Maintenance
&
Repairb.
Installation1.
Install
the
new
evaporator
assembly
In
the
chamber.2.
Place
the
urethane
seal
on
top
of
the
lock
foam
insulating
material.3.
Place
the
wooden
deck
with
plastic
ring
and
rubber
seal
on
the
cooling
chamber.Adjust
the
evaporator
inside
the
chamber
to
properly
align
the
rubber
seal
andevaporator
while
pressing
the
rubber
seal
ring
onto
the
evaporator.4.
Place
the
aluminum
plates
in
position.
Reconnect
the
wires
to
the
latching
mecha¬nism
and
install
the
KSB
tubes.5.
Align
each
aluminum
plate
with
the
scribe
lines
on
the
frame
and
secure
them
inposition.6.
Install
the
front
and
rear
rails.7.
Install
the
deck
and
console.8.
Connect
the
drain
tube.9.
Install
and
connect
the
resistance
temperature
detector
(paragraph
6-14).10.
Install
the
gyro
action
drive
assembly
(paragraph
6-4).11.
Reconnect
the
main
power
cord
and
main
power
plug.12.
Reconnect
refrigeration
lines
and
recharge
the
system.
Then
check
for
leaks
(para¬graph
6-16).6-13.
Condensing
Assembly
Replacementa.
Removal1.
Set
main
circuit
breaker
to
OFF.2.
Unplug
the
power
cord
from
socket.3.
Remove
all
cabinet
panels.4.
Disconnect
compressor
leads
at
terminals
7,
8,
and
9
on
TB201.5.
Remove
refrigerant
from
the
system
(see
paragraph
6-16).6.
Using
an
open
end
wrench
(1-3/8
in),
disconnect
the
suction
line
from
compressor.7.
Using
an
open
end
wrench
(25/32
in),
disconnect
the
high
pressure
line
from
theservice
valve.6-23

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Sorvall rc-5b