2.3
General Requirements for Ventilation and Maintenance
During the installation ensure that the following conditions are followed.
Keep at least 1000mm of clearance to the front of the UPS for air flow and future
maintenance purposes.
Keep at least 300mm of clearance from the rear of the UPS for air-flow space.
Keep at least 300mm of clearance to the top of UPS for maintenance operations.
Front Side
Other
>1000mm
Equipment
Top Side
>300mm
UPS
30
Rear Side
>300mm