Install 2 fasteners on the rail kits on the pallet edge by fastening 4 screws in the pallet.
Remove the UPS from the pallet by using the rails to slide the UPS forward onto a flat
surface. See the next figure when using a Fork Lift to remove the UPS from the pallet.
10kVA
10kVA
23