Vatech Premium PAX-i3D User Manual page 151

Table of Contents

Advertisement

13.2.2
Maintenance Task Checklist
Before operation, ensure that the equipment is clean and ready for use.
Make sure that all parts that come in direct contacts with the patient
have been cleaned thoroughly.
After using the equipment, make sure that the Main Power Switch has
been turned off.
Ensure that the equipment is firmly plugged into a dedicated power
source.
Ensure that the plug and the power cord are not heated abnormally.
Confirm that the LED indicator turns yellow when the Exposure Switch
is pressed. Ensure that the LED indicator remains yellow for the entire
duration of the exposure.
Ensure that the power cable is not kinked, broken, exposed and free of
all other defects.
Confirm that activating the Emergency Stop Switch ceases the unit's
operation. Pressing the Emergency Stop Switch should stop all
movement of the equipment and X-ray emission.
Ensure that all visible labels are intact and legible.
Check for possible damages to the Exposure Switch cable.
Confirm that the audio message is audible throughout the duration of
the exposure.
PCT-90LH User Manual
13. Cleaning and Maintenance
Tasks
Period
Daily
Daily
Daily
Daily
Daily
Daily
Weekly
Weekly
Monthly
Monthly
145

Advertisement

Table of Contents
loading

This manual is also suitable for:

Premium pct-90ln

Table of Contents