Communication; About Communication; Controller Communication Page - Deif GPC 300 Operator's Manual

Generator paralleling controller
Table of Contents

Advertisement

8.8

Communication

8.8.1

About communication

The controller or display must be powered off and powered on for communication changes to apply.
Power off and on
This must be done by authorised personnel who understand the risks involved in accessing the power supply or
installation design. Take extreme care in the enclosure next to the ACM terminals. The controllers must not be in
operation and the controlled breakers must be open.
8.8.2

Controller communication page

Ready for operation
Home / Tools / Communication
Controller communication
Name
1
Controller ID
IPv6 address
2
Label
DNS preferred
DNS alternate
IP address mode
IPv4 address
Subnet mask
Default gateway
Identify
3
No.
Item
1
Controller communication list
2
Selected setting
3
Identify
4
Display page
5
Write *
NOTE
* For changes to communication settings to take effect, all controllers and displays in the same system must be powered
off and powered on.
OPERATOR'S MANUAL 4189341171C UK
Value
4
fe80::226:77ff:fe01:7928
DG 1
10.10.103.2
10.10.103.3
Static
10.10.103.100
255.255.255.0
10.10.103.1
Display
4
Notes
Shows the controller communication settings.
Select
OK to configure the settings (not all settings are configurable).
Runs the controller rack identification feature.
The
Power status LED on the paired controller flashes.
Select to go to the display communication settings.
Writes the settings to the controller.
DANGER!
Write
12:00
5
Page 72 of 91

Advertisement

Table of Contents
loading

Table of Contents