Clean Front Installation - Framing (Non Cool Wall) - Regency Fireplace Products Grandview G800EH Owners & Installation Manual

Medium dv gas fireplace
Table of Contents

Advertisement

installation

Clean Front Installation - Framing (Non Cool Wall)

Framing Dimensions
M
N*
O
P
Q
R
S1
T
U
V
W
* Important: Framing height requires consideration of the hearth height. Dimension N = N + the thickness of the installed hearth.
Combustible header
N
IMPORTANT: Corner applications are vented from the top
only - rear venting cannot be used.
**The framing depth/width does not take into account dry wall/wood or similar materials against the back /side wall. The framing
depth will need to change based on the thickness of the material
(example: M - 37-1/2" framing width + 1/2" drywall = 38")
(example: O - 19-1/4" framing depth + 1/2" drywall = 19-3/4")
36
| Grandview
G800EH Gas Fireplace
®
Description
Framing Width
Framing Height
Framing Depth
Corner Facing Wall Width
Corner Facing Wall Width
Framed Chase Ceiling
Vent Centerline Height
Gas Connection Height
Gas Connection Inset
Gas Connection Width
Clearance to corner of unit
Non-combustible Height
**
M
P
W
Q
Corner=Top Vent Only
G800EH - Non Cool Wall
37-1/2"(953mm)
52" (1321mm)
22" (559mm)
46-1/2" (1181mm)
65-3/4" (1670mm)
84" (2134mm)
44" (1118mm)
1-1/2" (38mm)
6-3/8" (162mm)
3" (76mm)
2-3/4" (70mm)
11-1/2" (292mm)
R
Top Vent
**
O
S1
S
V
U
Rear Vent
S
T

Advertisement

Table of Contents
loading

Table of Contents