Fayat Group DYNAPAC SD2500W Operation & Maintenance Manual page 7

Paver finisher
Hide thumbs Also See for DYNAPAC SD2500W:
Table of Contents

Advertisement

Central lubrication system (o) .............................................................. 34
Screed eccentric adjustment ............................................................... 35
Push roller crossbar, adjustable .......................................................... 36
Fire extinguisher (o) ............................................................................. 37
First-aid kit (o) ...................................................................................... 37
Rotary beacon (o) ................................................................................ 38
Fuelling pump (o) ................................................................................. 39
Illuminated balloon (o) ......................................................................... 40
Installation and operation ..................................................................... 41
Maintenance ........................................................................................ 42
Replacing the lamp .............................................................................. 42
Truck Assist (o) .................................................................................... 43
D43
Mode of operation ................................................................... 1
1
Preparing for operation .............................................................................. 1
Required devices and aids .................................................................... 1
Before starting work (in the morning or when starting paving) .............. 3
Check list for the machine operator ....................................................... 3
1.1
Starting the paver finisher .......................................................................... 6
Before starting the paver finisher ........................................................... 6
"Normal" starting .................................................................................... 6
External starting (starting aid) ................................................................ 8
After starting ........................................................................................ 11
Observe indicator lamps ...................................................................... 13
Engine coolant temperature check (A) ................................................ 13
Battery charge indicator lamp (B) ........................................................ 13
Diesel engine oil pressure indicator lamp (C) ...................................... 13
Travel drive oil pressure indicator lamp (D) ......................................... 15
1.2
Preparation for transportation .................................................................. 17
Driving and stopping the paver finisher ............................................... 19
1.3
Preparations for paving ............................................................................ 20
Separator fluid ..................................................................................... 20
Screed heater system .......................................................................... 20
Direction marks .................................................................................... 21
Loading/conveying material ................................................................. 23
1.4
Starting for paving .................................................................................... 25
1.5
Checks during paving .............................................................................. 26
Paver function ...................................................................................... 26
Quality of the layer ............................................................................... 26
1.6
Paving with "screed control at paving stop" and "screed
charging/relieving" .................................................................................... 27
General ................................................................................................ 27
Screed charging/relieving .................................................................... 29
Screed control with paver finisher stop / in paving operation
(screed stop / paving stop / floating paving) ........................................ 29
Adjusting the pressure ......................................................................... 33
Setting pressure for screed control with paving stop + relieving: ........ 33
1.7
Interrupting/terminating operation ............................................................ 35
During breaks in paving (e.g. delay due to material trucks) ................. 35
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac sd2500ws897898

Table of Contents