Fayat Group DYNAPAC SD2500W Operation & Maintenance Manual page 570

Paver finisher
Hide thumbs Also See for DYNAPAC SD2500W:
Table of Contents

Advertisement

4
Inspection by an expert
Have finisher, screed and optional gas or electric system checked by a trained spe-
A
cialist
- when required (according to the operating conditions and the nature of application),
- however, at least once a year, check that they are all in good operational condition.
F 100 4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac sd2500ws897898

Table of Contents