Auger coverings
Screed covers and walkways
Screed transport safeguard
Hopper transport safeguard
Protective roof
Other facilities:
- Engine panels
- Lateral flaps
Accessories:
- First aid box
D 43 4
Check!
How?
For larger working widths, the walkway
plates must be extended and the auger
tunnels must be covered.
Folding walkways must be present
at the basic screed and all extension
parts and folded down accordingly.
Check that the side shields,
the side plates and the covers
are securely seated.
When the screed is raised / before
transport, make sure that the cross-
beam lock is fixed correctly.
When the hopper is closed / before trans-
port, the locks must be fixed correctly.
The locking bolts must be set properly.
Check that the hoods and flaps are
securely seated.
Equipment must be present on
the vehicle!
Always observe the
A
local regulations!