Installation - Quick BTH 513 Installation And Use Manual

Hydraulic thrusters
Table of Contents

Advertisement

Available languages

Available languages

5 - Installation

5.0 - Thruster
• The thruster can be installed at any angle within 90° from
vertical.
• The hydraulic motor needs no support.
24
• To position the thruster in the tube, find the half-
way point.
• Use the flange to mark the centre of the holes on
the tube.
• Fix the drilling template on the reference points,
making sure they are aligned with precision at the
half-way point of the tube.
F
• Take care that there are no resin residues in the
contact area between flange and tube; this could
cause misalignment. Any resin residues and any
other hindrance to correct contact must be remo-
ved by sandpaper.
INSTALLATION AND USE MANUAL BTH 513 - REV001A
BTH 513
0
1
2
3
4
5
6
N.B. All holes must be exactly aligned with
the half-way point of the tunnel, since
tolerance between propeller and tunnel
is minimal.
EN
7
8
9
10

Advertisement

Table of Contents
loading

Table of Contents