Quick BTH 513 Installation And Use Manual page 27

Hydraulic thrusters
Table of Contents

Advertisement

Available languages

Available languages

5 - Installation
5.3 - Fitting position and oil tank
Waterline
Tunnel center line
POSITION THE PIPE CORRECTLY, IN ORDER TO PREVENT "SIPHON" EFFECT.
THE TANK MUST ALWAYS END UP IN VERTICAL POSITION.
1
> 0,2 x d
d
INSTALLATION AND USE MANUAL BTH 513 - REV001A
BTH 513
• Fit the oil tank (1) above the waterline by at
least 20% of the distance (d) from the waterli-
ne to the centre of the tunnel.
This is for ensuring enough overpressure of
oil in the gearhouse.
• Fill the oil tank with gear oil type GL-5
Oil
EN
Air
27

Advertisement

Table of Contents
loading

Table of Contents