Mobius
Chrom 20 System with Flexware
®
Moving the System
Before moving the system, the air reservoir must be emptied. The reservoir acts as an air buffer
when the emergency stop is engaged. The air tank is located behind the Flexware
Assembly. Ensure that the HMI screen is placed in a safety position before moving the system.
Assemblies
®
1. Turn valve Y102 OFF. Y102 is located just
below the air reservoir behind the side
Access Door.
2. Once air is released, turn valve Y102 ON.
Moving the System on Site
1. Disengage the bases from each other. The
bases must be moved individually. Do not
move the connected bases.
AIR RESERVOIR
2. Push each base to the desired location.
3. Reconnect the bases once they are in the
new location.
Moving the System to a New Site
1. Disengage the bases from each other. The
bases must be moved individually. Do not
move the connected bases.
2. To lift the bases you could use a forklift.
Ensure the fork hold front and rear of the
frame. Be carefull to not dammage the
wheel with fork.
3. Move the base to the desired location
4. REconnect the bases once they are in the
new location.
201
Clamshell
®
Need help?
Do you have a question about the Millipore Mobius Chrom 20 System and is the answer not in the manual?
Questions and answers