10 COMMISSIONING

Before official operation, the following checks are suggested to do:
a)
Check all the connections are correct and wire diameter is proper;
b)
Make sure that the controller DC power has fuse, and it is correctly connected to the positive
and negative of starting battery;
c)
Take proper action to prevent engine from cranking successfully (e. g. remove the connection
wire of fuel valve). Make sure everything is correct. Connect starting battery power, and the
controller shall conduct the procedure;
d)
Press "Start" button, and genset will start. After the set cranking times, controller will send signal
of Crank Failure; and then press "Stop" to reset controller;
e)
Recover the action of preventing engine from cranking successfully (e. g. recover the wire of fuel
valve). Press "Start" button again, and genset will start. If everything goes well, genset will go
normally running after idle running (if configured), and Mains and Gen will close. During this
period, please observe engine's running status, alternator voltage and frequency carefully. If
there is something unusual, stop the running genset and check all wire connections according to
this manual;
f)
For any other questions please contact with SmartGen service personnel.