Hardware Installation
September 2020
4. After zeroing the transmitter, close the equalize valve on the low pressure
5. Close the equalize valve on the high pressure (upstream) side.
58
A. (Plugged)
B. Isolate (open)
C. Process
D. Equalize (open)
E. Equalize (open)
F. Drain vent (closed)
G. Process
H. Isolate (closed)
I. (Plugged)
(downstream) side of the transmitter.
A. (Plugged)
B. Isolate (open)
C. Process
D. Equalize (open)
E. Equalize (closed)
F. Drain vent (closed)
G. Process
H. Isolate (closed)
I. (Plugged)
Reference Manual
00809-0100-4107
Rosemount 2051 Pressure Transmitter