Installation Location; Required Tools And Hardware - HP StorageWorks 1/16 Tape SuperLoader Manual

Table of Contents

Advertisement

Installation Location

Choose a location that meets the following criteria:
Note:

Required Tools and Hardware

You need a Phillips screwdriver to install your SuperLoader.
Make sure you have all the necessary parts you need before you begin installation.
(These parts should have been included with your rack.) You need the following
parts:
1/16 Tape SuperLoader Reference Guide
Caution:
To prevent damage to the tapes and the tape drives, position the
SuperLoader so that no cooling vents are located directly in front of the unit;
this helps minimize the amount of foreign debris entering the tape path.
Room temperature: 10ºC to 35ºC (50ºF to 95ºF)
Power source:
— AC power voltage: 100 V to 127 V or 200 V to 240 V
— Line frequency: 50 Hz to 60 Hz
Air quality: Minimal sources of particulate contamination. Avoid areas near
frequently used doors and walkways, stacks of supplies that collect dust, and
smoke filled rooms. Avoid placing the SuperLoader near printing machines as
airborne ink contaminates tape drives.
Excessive dust and debris can damage tapes and tape drives.
Humidity: 20% to 80% relative humidity (non-condensing)
Front Clearance: about 2 inches (about 5 cm) from rack door; about 6 inches
(about 15 cm) from wall or solid object; about 12 inches (about 30 cm) to
insert a cartridge in the mailslot.
8 clip nuts (plus four additional clip nuts if using the optional installation
rails)
2 U-channel brackets with spring clips
2 rear support brackets
Installation and Configuration
11

Advertisement

Table of Contents
loading

Table of Contents