Verification - HP StorageWorks 1/16 Tape SuperLoader Manual

Table of Contents

Advertisement

Installation and Configuration
Note:
To power on the SuperLoader:
1. Push the power switch that is on the back of the SuperLoader to the on

Verification

When you first power on the SuperLoader, it automatically runs a Power On Self
Test (POST). During the POST, the right (amber) LED flashes rapidly. After the
POST, the left (green) LED illuminates steadily, and after approximately three
minutes the LCD displays the HP logo. Do one of the following:
If you cannot resolve the problem yourself, contact your authorized service
representative.
22
Do not power on the host before powering on the SuperLoader (first time only).
position (the 1 is pressed).
Wait while the SuperLoader performs its power-on sequence. During this
time, the following activities occur:
The cooling fans begin to operate.
The LCD illuminates and displays power-on messages.
The SuperLoader performs a power-on self-test (POST).
The SuperLoader performs a calibration and magazine element status.
If the SuperLoader powers on successfully, continue configuring the
SuperLoader. See "Configuration."
If the SuperLoader does not power on successfully, make sure that:
— The power switch is on.
— The power cord is inserted correctly.
— The SCSI bus is terminated.
— The SCSI cable is connected to the SuperLoader and host computer.
— The host computer system is turned on.
— There is not an error code displayed on the SuperLoader's LCD. (If an
error message is displayed, see Chapter 6, "Troubleshooting.")
1/16 Tape SuperLoader Reference Guide

Advertisement

Table of Contents
loading

Table of Contents