5 .4 Parallel UPS Operation
5 .4 .1 Parallel machine installation
—
5.4.1-1:
Up to 4 units can be paralleled. The outputs are paralleled to increase the load capacity of the power
Parallel system
system and for redundancy.
installation
—
5.4.1-2
Parallel system
Wiring diagram
—
5.4.1-1
For single UPS input breaker F2-1, F2-2, F2-3, F2-4. Please choose the same ratings of according Input/
output fuses in Table 2.
For the main input breaker F1 and main output breaker F4, pls select the ratings based on the
quantity of parallel units N(N=2, 3, 4), the rating calculation formula is F1=F4=F2-1*N.
—
5.4.1-2