Installation Of The Machine; Preparation; Connecting To Power Source - YILMAZ PCC 6505 User Manual

Hide thumbs Also See for PCC 6505:
Table of Contents

Advertisement

Available languages

Available languages

5. INSTALLATION OF THE MACHINE

5.1. Preparation

5.1.1. The machine size and weight measurements, given the technical specification sheet.The
ground, where the machine will be placed, should be even, solid enough to bear the weight of
the machine.
5.1.2. The machine should be located approx. 100 cm away from the rear wall. On the backside of the
machine you will find connection tube for the collection of burr and swarf, hydro-pneumatic
system, cable channels, power supply connection plug.
5.1.3. You can provide the balance of the machine with adjustable counterforts in the bottom part.

5.2. Connecting to Power Source

5.2.1. Electrical connection must be made by a licensed electrician
5.2.2. The power outlet socket on the machine should be available.
5.2.3. Plug the machine to a grounded socket.
5.2.4. Mains voltage of the machine is optional as 400 V 50 Hz.
5.2.5. Check the supply voltage. The source voltage must be in accordance with the
data on the machine's label.
5.2.6. After electrical connection is made, machine must be operated in idle running and it must be
controlled whether rotation directions of cutting tools are correct or not and if the rotation
direction is wrong, appropriate connection must be made.
109

Advertisement

Table of Contents
loading

Table of Contents