Advertisement

4.4. Movable parts on the machine should be fixed before carrying out the transport.
4.5. The machine size and weight measurements, given the technical specification sheet.

5. INSTALLATION OF THE MACHINE

5.1 Preparation

5.1.1 The machine size and weight measurements, given the technical specification sheet.The ground, where the
machine will be placed, should be even, solid enough to bear the weight of the machine.
5.1.2 The machine should be located approx. 50 cm away from the rear wall. The power connection plug of the
machine is located on the rear side of the machine.
5.1.3 You can provide the balance of the machine with
adjustable counterforts in the bottom part.
5.1.4 Profile fitting parts (FIGURE 6-7) are delivered disassembled. Assemble profile fitting parts on the Table
(3UA810030-0020) as it is seen in the figure.