Download Print this page

Project Timber Evolution My Den Building Instructions page 9

8x8 metal roof side opening window right
Hide thumbs Also See for Evolution My Den:

Advertisement

17
Left Gable (High) Panel Stages
Lining
Flush
Front
20
Gable and Door Panel Position
Fit the Plain Gable
Panel and Door
Panel in this position
Side
50mm
Screws
Pilot drill holes
before fixing
Wall Panels Section Stages
Left Gable (High) Panel Stages
18
ID: PT25534
2 50mm
Screws
Lining
Flush
Side
Pilot drill holes
before fixing
21
UPVC Door fixing
Side
(LEFT)
Front
Align and fit the UPVC Door Cill
to the door panel (LEFT)
*Check the Side Opening
Window (LEFT) position
option floor plan for
guidelines.
Position and fix
the plain gable
panel (Left)
Front
Side
(LEFT)
ID: 19503
Front
19
Left Gable and Door Panel (LEFT) Position
Front
Side
(LEFT)
Align and fix the door
section to the left gable
panel (high) and plinth
22
UPVC Door fixing
Front
ID: 19503
80mm
Screws
Fix and secure the UPVC
Door Cill to the door panel
50mm
Screws
Pilot drill holes
before fixing
Side
Front

Advertisement

loading
Need help?

Need help?

Do you have a question about the Evolution My Den and is the answer not in the manual?

Questions and answers