CB operation
(i)
Figure 12.11-2 shows how to open CB (Off position).
Control
10:48
1/6
_Circuit Breaker
>
SPOS
>
responses?
DPOS
>
TPOS
>
Software Switch
>
Auto Sequence
>
Output the command
[ ENTER]
Control
10:48
1/6
Waiting for the
_DPOS_SYN_Dev1
>
second response
On
DPOS_SYN_Dev1
10:48
Selecting...
[ ENTER]
DPOS_SYN_Dev1
10:48
Current status:
On
Select control POS:
_Off
Change start?
ENTER:Yes CANCEL:No
[ ENTER]
DPOS_SYN_Dev1
10:48
Operation failed.
CAUSE:
Select failed.
Control
10:48
_Circuit Breaker
SPOS
DPOS
TPOS
Software Switch
Auto Sequence
Figure 12.11-2 Operation for opening CB
Note: Time out will occur if no responses come from CB device.
1
Note: For control 'Circuit breaker', the user should connect 'DPSY01' function with
2
circuit breakers using binary IO modules. See chapter
application: Double position controller with synchronizing-checking (DPSY)
DIR mode
Double
SBO mode
Executing screen
DPOS_SYN_Dev1
10:48
Control execution
Push O button
Select control POS:
On
CANCEL:Operation stop
Selecting succeeded.
Selecting failed.
[ ]
1/6
>
>
>
>
>
>
- 1309 -
O
Open
DPOS_SYN_Dev1
10:48
Controlling...
[CANCEL]
CANCEL: Operation stop
Controlling failed
1
Time out
DPOS_SYN_Dev1
DPOS_SYN_Dev1
10:48
10:48
Operation completed.
Operation failed.
CAUSE:
Time limit over.
[ ]
[ ]
Control
10:48
1/6
_Circuit Breaker
>
SPOS
>
DPOS
>
TPOS
>
Software Switch
>
Auto Sequence
>
Control and monitoring
6F2S1915 (0.46)
[CANCEL]
Cancel succeeded.
Cancel failed
DPOS_SYN_Dev1
DPOS_SYN_Dev1
10:48
10:48
Operation failed.
Operation canceled.
CAUSE:
Select failed.
[ ]
Control
10:48
1/6
_Circuit Breaker
>
SPOS
>
DPOS
>
TPOS
>
Software Switch
>
Auto Sequence
>
.