Travel reduction gears

Service specifications
Oil level check: Every 250 hours
Oil drain: Every 1000 hours (after the first 250 hours during the run-in period)
Oil capacity (per reduction gear): 9.1 l (2.4 US gal)
Type of oil: (Refer to page 6-5)
Level
1. Park the machine on flat, horizontal ground.
2. Move the machine so that plug (1) is in the lowest
possible position.
3. Stop the engine and remove the ignition key.
4. Remove the plug (2) and check the oil level. The level
must come up to the bottom edge of the port (2). If
necessary, add oil through this orifice (2) until the level
comes up to the bottom edge of the orifice. Remove
the plug (2) and check the oil level.
5. Install plug (2).
6. Repeat Steps 2 to 5 for the other travel reduction gear.
7. Travel slowly with the machine and make sure there
are no leaks.
Draining and refilling
1. Park the machine on flat, horizontal ground.
2. Move the machine so that plug (1) is in the lowest
possible position.
3. Shut down the engine and remove the ignition key.
4. Place a receptacle of suitable capacity under the travel
reduction gear and remove the two plugs (1) and (2).
5. Allow the oil to drain.
ATTENTION: Check the condition of the drained oil. If
it contains metal filings or foreign matter, consult your
CASE CONSTRUCTION Dealer.
6. Install the plug (1), fill with oil through the orifice (2)
until oil comes up to the bottom edge of orifice then
install plug (2).
7. Repeat Steps 2 to 6 for the other travel reduction gear.
8. Travel slowly with the machine and make sure there
are no leaks.
6 - MAINTENANCE
6-49
1
MMYFQD-007
2
MMYFQD-007