Case CX300C Operator's Manual page 246

Crawler excavator
Hide thumbs Also See for CX300C:
Table of Contents

Advertisement

6.
Install the arm/bucket linkage pin and its hardware.
7.
Start the engine.
8.
Bring the bucket rod into its housing.
9.
Stop the engine and remove the ignition key.
10. Install the linkage seals between the rod and the
bucket. Change them if necessary.
11. Install the rod/bucket linkage pin and its hardware.
12. Grease the linkage pins.
6 - MAINTENANCE
6-64
3
TX8XZ1-022

Advertisement

Table of Contents
loading

Table of Contents