3 - CONTROLS/INSTRUMENTS
Boom and upperstructure swing left-hand
control lever (optional)
The speed of movement of the boom or the upperstruc-
ture swing depends on the control lever tilt angle. In the
intermediate position two movements can be obtained si-
multaneously.
NOTE: When the upperstructure swing control is re-
leased, the upperstructure may continue to rotate due to
the force of inertia. In this event, make allowance for the
extra movement by releasing the control slightly earlier.
5
VF3UDD-001
(1) The boom lowers.
(2) The boom raises.
(3) The upperstructure turns to the left.
(4) The upperstructure turns to the right.
6
VF3UDD-002Z
Arm and bucket right-hand control lever (op-
tional)
The speed of movement of the arm or the bucket depends
on the control lever tilt angle. In the intermediate position
two movements can be obtained simultaneously.
7
FIQCKA-001
(5) The arm extends.
(6) The arm retracts.
(7) The bucket retracts (filling).
(8) The bucket extends (dumping).
8
FIQCKA-002X