Case CX300C Operator's Manual page 268

Crawler excavator
Hide thumbs Also See for CX300C:
Table of Contents

Advertisement

6 - MAINTENANCE
Note S: Have this checked every 6 months by your CASE CONSTRUCTION Dealer.
Note T: When the float reaches the level line (A).
Note U: Periodically.
Note V: Check once a month and have it checked every 6 months by a specialist.
Note W: If the machine is equipped with a hydraulic breaker, it is imperative that the servicing intervals are reduced,
refer to page 6-34.
NOTE: Once the machine has completed 500 hours (then 1000 hours, 1500 hours, etc.) the message "Service due"
will appear on the screen (refer to page 3-18) by way of a reminder that service work is due. (It is possible to increase
this lapse of time. Consult your CASE CONSTRUCTION Dealer).
6-86

Advertisement

Table of Contents
loading

Table of Contents