3.2.3.4 Connecting the BCB box

Open the cover on the BCB box, and connect the BCB ports on the dry contact card to the
control signal ports on the BCB box. For details, see the PDC-(0250, 0400, 0630)
DC0384BXA BCB Box User Manual or PDU8000-(0125, 0250, 0400, 0630, 0800)
DCV8-BXA001 BCB Box User Manual.

3.2.3.5 Connecting the BBB box

Connect the BBB box. For details, see the PDU8000-(0630, 1250, 2000) DCV8-BGA001 BBB
Box User Manual.

3.2.3.6 Installing a Battery Grounding Failure Detector

Procedure
Step 1 Install a battery grounding failure detector. For the installation method, see UPS5000 Battery
Grounding Failure Detector User Manual.
Figure 3-23 Position of a battery grounding failure detector in a UPS5000–E-200K-SM
(1) Battery grounding failure detector
Issue 02 (2017-02-25)
Figure 3-23
shows the position for a battery grounding failure detector in a
UPS5000–E-200K-SM.
Figure 3-24
shows the position for a battery grounding failure detector in a
UPS5000–E-200K-FM.
Figure 3-25
shows the position for a battery grounding failure detector in a
UPS5000–E-300K-SM.
Figure 3-26
shows the position for a battery grounding failure detector in a
UPS5000–E-300K-SMT.