TRANSPORTATION (high reach demolition equipment fitted)
6. Carefully lower the work equipment into the parked position. Exit the cab carefully - the floor is higher above
the ground than before.
7. Secure the machine and reconnect the trailer neck. If the transport pin is not already installed, install it now.
REMARK
Carry out this operation in reverse when unloading the machine from the trailer.
TRANSPORTATION (demolition digging equipment fitted)
PROCEDURE FOR LOADING ON TO TRAILER
1. Follow the same procedure as outlined for the standard excavator (see main machine manual).
Make sure that the additional counterweight is removed
when the demolition digging equipment is fitted.
TRANSPORTATION (high reach demolition equipment alone)
PROCEDURE FOR LOADING ON TO TRAILER
It is the responsibility of the transporting company to ensure
that the load is secure and safe.
This procedure includes the following basic steps:
1. Prepare the work equipment.
2. Approach the trailer.
3. Install the equipment onto the trailer.
4. Detach the work equipment and move machine away.
PREPARING HIGH REACH WORK EQUIPMENT FOR TRANSPORT
1. There must be plenty of room available to manoeuvre the
machine for removal of work equipment. Make sure the oper-
ations are carried out in a flat, level, spacious area.