Komatsu PC450-8 Operation & Maintenance Manual page 425

Hide thumbs Also See for PC450-8:
Table of Contents

Advertisement

HIGH REACH DEMOLITION EQUIPMENT 27M
MACHINE OPERATIONS AND CONTROLS
BEFORE STARTING ENGINE
Always carry out the following inspection and maintenance before
starting work each day.
q Greasing
Supply grease to the greasing points shown in the diagram.
1.
Boom top pin (1 place)
2.
Intermediate link cylinder (2 places)
3.
Boom cylinder (4 places)
4.
Boom foot (2 places)
5.
Link (3 places)
q Check for cracks, furrows in the base metal.
q Check for wear and damage to the base metal.
q Perform all checks required by the basic machine manual.
MACHINE OPERATIONS AND CONTROLS
6.
Arm (2 places)
7.
Bucket cylinder (2 places)
8.
Arm cylinder (2 places)
9.
Intermediate link top pin (1 place)
10.
Boom connect pins (2 places
7
7
7-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc450lc-8

Table of Contents