Komatsu PC450-8 Operation & Maintenance Manual page 324

Hide thumbs Also See for PC450-8:
Table of Contents

Advertisement

MAINTENANCE PROCEDURE
CHECK SWING PINION GREASE LEVEL, ADD GREASE
q
Prepare a scale.
1. Swing 3 times each to the left and right, then stop the
machine.
2. Remove bolts (1) (2 bolts) on the top of the revolving frame
and remove cover (2).
3. Insert scale (3) through inspection and maintenance hole
(A) into the grease, and check that height (S) of the grease
is at least 54 mm. If the grease level is low, add grease.
4. Check if the grease is milky white. If it is milky white, it is
necessary to change the grease. Please contact your
Komatsu distributor.
The total amount of grease is 33 liters (29.7 kg).
5. Install cover (2) with bolts (1).
4-58
MAINTENANCE
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc450lc-8

Table of Contents