Komatsu PC450-8 Operation & Maintenance Manual page 143

Hide thumbs Also See for PC450-8:
Table of Contents

Advertisement

OPERATION
DETAILED CONTROLS AND GAUGES
Right work equipment control lever (4) is used to operate the
boom and bucket.
Boom operation
(a) RAISE
(b) LOWER
Bucket operation
(c) DUMP
(d) CURL
N (Neutral) : The boom and bucket are held in position and do
not move.
3-77

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc450lc-8

Table of Contents