List Of Figures - oventrop Regumaq X-45 Operating Instructions Manual

Hide thumbs Also See for Regumaq X-45:
Table of Contents

Advertisement

Regumaq X-45

List of figures

13. List of figures
Regumaq X-45 ............................................................................................................................11
Installation scheme with a Regumaq X-45 fresh water station ............................................... 13
Installation scheme with two Regumaq X-45 fresh water stations .........................................14
Dimensions of the Regumaq X-45 in mm (front) ..................................................................... 17
Dimensions of the Regumaq X-45 in mm (side) ....................................................................... 18
Dimensions of the Regumaq X-45 in mm (wall bracket) .......................................................... 19
Terminal assignment .................................................................................................................20
Installation relay (item no. 1152089) ......................................................................................... 21
Water sampling valve (item no. 4209102) ................................................................................ 21
Strainer (item no. 1120008) .......................................................................................................22
Aquanova Magnum water filter .................................................................................................22
Removal of the upper shell....................................................................................................... 24
Dismantling of the wall bracket................................................................................................ 24
Use of the wall bracket as drilling template ............................................................................. 24
Position of the washer .............................................................................................................. 24
Internal design of the buffer storage cylinder...........................................................................26
Equipotential bonding ...............................................................................................................27
Filling and venting of the storage cylinder circuit .....................................................................28
Filling and venting of the potable water circuit .........................................................................29
Removal of the controller from the lower shell ........................................................................30
Mounting position ..................................................................................................................... 31
Opening of the controller .......................................................................................................... 31
Cable channels in the lower shell .............................................................................................. 31
Touch control panel ...................................................................................................................33
Main menu .................................................................................................................................33
Return stratification...................................................................................................................42
Removal of the controller from the lower shell ....................................................................... 44
Mounting position .................................................................................................................... 45
Opening of the controller ......................................................................................................... 45
Decalcification of the removed heat exchanger ....................................................................... 51
Potable water circuit ..................................................................................................................52
Cleaning of the measuring turbine ...........................................................................................53
Circlip ........................................................................................................................................53
Loosening of the measuring turbine ........................................................................................ 54
Installation of the measuring turbine ....................................................................................... 54
Correct positioning of the measuring turbine ......................................................................... 54
circuit) ....................................................................................................................................... 60
60
58
.........................................................................................................................25
138114082-V04.04.2022

Advertisement

Table of Contents
loading

Table of Contents