Regumaq X-45
Commissioning
Fig. 23:
Mounting position
1
Recess for operation position
2
Recess for mounting position
Fig. 24:
Opening of the controller
1
Connection panel cover
2
Hexagon socket screw
3
Supply line cover
138114082-V04.04.2022
3
Loosen the screw (position
and put it aside.
4
Slide the connection panel cover (position
on page 31) upwards until it audibly clicks into
place.
5
Fold down the supply line cover (position
on page 31).
6
Guide the power line through the opening provided in
the casing.
7
Carry out the electrical connections according to the
terminal assignment (see Fig. 7 on page 20).
8
Fix the power line with a suitable cable tie for strain
relief.
9
Close the supply line cover and the connection panel
1
cover.
2
10
Tighten the screw.
11
Put the controller back from the mounting position to
the operation position (see Fig. 22 on page 30).
12
Lay the electrical lines in the channels provided in the
lower shell.
1
Fig. 25:
2
1
Channel for sensor and control lines
3
2
Channel for 230 V line
13
Establish the power supply.
Z
The fresh water station is ready for operation.
2
in Fig. 24 on page 31)
Cable channels in the lower shell
1
in Fig. 24
3
in Fig. 24
1
2
31