Towing - Fayat Group DYNAPAC F2500C Application, Operation & Maintenance

Table of Contents

Advertisement

7

Towing

f
Heed all regulations and apply all safety measures applicable for towing heavy con-
struction machines.
The towing vehicle must be capable of securing the paver finisher, even on slopes.
m
Use only approved tow bars!
If necessary, remove any attachments and accessories from the paver finisher and
the screed until the basic width has been attained.
Two high-pressure cartridges (2) are
A
located on both of the travel drive
pumps (1).
The following activities must be carried
out to activate the towing function:
- Loosen lock nut (3) half a turn.
- Screw in the bolt (4) until increased re-
sistance occurs. Then screw the bolt a
further half turn into the high-pressure
cartridge.
- Tighten the lock nut (3) to a torque
of 22 Nm.
m
On completion of the towing process, re-
store the initial status.
1
2
3
4
C 10 23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac f2500cs

Table of Contents