If a different pressure is detected during the measurement process, proceed
A
as follows:
- Screw head section for flat nipple
(toolbox) onto the grease gun.
- Top up the grease in the chain tighten-
er at the filling connection (A) until the
correct pressure appears at the pres-
sure gauge (B).
- Remove the grease gun again.
If the tension is too high: see section
A
"Relieving the chain".
Repeat
this
A
drive units!
Relieving the chain:
f
The grease in the tensioning element is
under pressure. Carefully and slowly un-
screw the filling valve, but not too far.
- Unscrew the filling connection (A) us-
ing a tool until the grease is able to
emerge from the lateral hole.
The idler wheel moves back independ-
A
ently or must be reset manually.
- Close the filling connection again
properly as soon as the correct pres-
sure
appears
gauge (B).
F 73 8
procedure
on
both
at
the
pressure
B
A