Starting The Paver Finisher; Before Starting The Paver Finisher; Normal" Starting - Fayat Group DYNAPAC F2500C Application, Operation & Maintenance

Table of Contents

Advertisement

1.1

Starting the paver finisher

Before starting the paver finisher

Before starting the diesel engine and beginning operation, the following steps must
be performed:
- Daily maintenance of the paver finisher (see chapter F).
Check the operating hour counter to determine whether or not additional mainte-
m
nance work (such as monthly or yearly maintenance) must be performed.
- Check the safety devices and protective devices.

"Normal" starting

Set the drive lever (1) to the centre position and the speed adjuster (2) to minimum.
- Insert the ignition key (3) in position "0".
Starting is not possible when the "Start inhibit" (4) or drive mode (5) indicator lamps
A
indicate that an emergency stop button (6) / (7) on the remote control has been
pressed, or the auger function (8) or conveyor function (9) are switched to "AUTO" or
"MANUAL" operating mode.
NOTE
- Press the starter button (10) to start the engine. Run the starter continuously for a
maximum of 30 seconds, then take a break for 2 minutes!
D 40 6
Caution! Possible subsequent damage!
- No additional consumers (light, heater, etc.) may be
switched on when starting.
- Do not switch the consumers on until the engine has
reached a speed of >1000 revs.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynapac f2500cs

Table of Contents