13
Screed
All work required for mounting, setting up and extending the screed are described in
the screed operating instructions.
13.1
Electrical connections side board - screed - Conventional version
Prepare or make the following electrical connections when the mechanical compo-
nents have been mounted and set up:
- Set remote control to holder (1).
- Connect plug (2) with the remote control.
m
If the remote control is not implemented, the plug (2) has to be set to the bridge
socket (2a).
- Connect the connection lead (3) of the side board with the socket (4) of the screed.
The cover of the extendable part must be removed to install the cables.
A
Install the cables to rule out the risk of any damage to the cables.
m
If the side board is not connected, the socket (4) has to be connected with the bridge
plug (4a).
E 10 70
6
5
7
8
2
1
2a
3
4
4a