Interrupting/terminating operation

During breaks in paving (e.g. delay due to material trucks)

- Determine the approximate duration.
- When cooling down of the material below the minimum paving temperature must be
expected, run the paver finisher empty and create an edge like the end of a layer.
- Set the drive lever (1) to the centre position.
During extended interruptions
(e.g. lunch break)
- Set the drive lever (1) to the centre position and the speed adjuster (2) to minimum.
- Switch the screed heater system off.
- Switch off the ignition.
- When screed is operated with the optional gas heating system, close the valves of
the bottles.
The screed must be heated up to the correct paving temperature before paving may
A
be restarted.