LUBRICATION
Lube Point
Item
Description
Turntable
Turntable Gear
20
Box
Turntable Gear
21
and Drive Pinion
Turntable
22
Bearing
NOTE:
Rotate the turntable 90° and apply grease to fittings. Continue rotating 90° and grease the fittings until the whole
bearing is greased.
5-16
Figure
Approved
No.
Lubricant
GL-5
Extended
Figure 5-6
Service Interval
Gear Lubricant
6829012964
EP-OGL
Open Gear
Figure 5-6
Lubricant
6829102971
EP-MPG
Extreme
Pressure
Figure 5-6
Multipurpose
Grease
6829003477
Published 5-3-2016, Control # 555-02
RT530E-2 OPERATOR'S MANUAL
Lube
Lube Interval
Capacity
• Check and fill every
50 hours
4.0 l
• Drain and fill after
(4.25 qt)
first 250 hours and
every 500 hours or
12 months thereafter.
Coat all
500 hours or 6 months
teeth
Until
grease
extrudes
the whole
500 hours or 6 months
circumfer-
ence of the
bearing
Application
Use dipstick. If no
dipstick, fill to top of
case.
Spray on
2 grease fittings at
the front of the
turntable
Need help?
Do you have a question about the Grove RT530E-2 and is the answer not in the manual?
Questions and answers