Project Organization Checklist

In order to set up the TRITON+ monitor to successfully communicate
and record flow information, the following steps must be performed.
Refer to the chapters identified for more detailed information.
Perform these steps prior to the field installation:
Activate the SIM card and get the IP address (TRITON+ 8000-
FST-IM-4WW-ATT, FST-IM-EP-4WW-ATT, 8000-FST-IM-
4WW-VZW, 8000-FST-IM-EP-4WW-VZW) (Refer to Chapter3,
Activating the SIM Card)
Note: Request the SIM activation within 48 hours of
monitor installation and before heading to the field to
install the TRITON+.
Configure and activate the monitor (in-office) (Refer to Chapter 4,
Configuring the Monitor Location and Activating the Monitor)
Perform these steps in the field once the above steps are complete:
Install the Sensors (Refer to Chapter 5, Sensor Installation and
Connection)
Install and connect the wireless antenna (Refer to Chapter 3,
Installing the Wireless Antenna)
Install the monitor (Refer to Chapter 7, Monitor Installation)
Connect to the monitor for on-site communication (Refer to
Chapter 4, Activating the Monitor)