Options; Water Cooler Maintenance; Remarks - Seco PACKS EASYSHRINK 20 Operating Instructions Manual

Table of Contents

Advertisement

5.8 Options

Water cooling module can be equipped with a cooling station.

5.9 Water cooler maintenance

Water level check
Water tank change
Radiator cleaning

5.10 Remarks

- The tank must only be filled up with pure water (tap water), any other product is fobidden (distilled water, demineralized
water, glycol etc.).
- Should water cooler be idle for a long period, device must be stored in an area at ambient temperature to avoid any risk of
frost.
- Repairs on the refrigerating circuit must only be made by a refrigerating engineer.
- Water cooler must not run with an empty tank.
1. Unscrew and remove left cooling bell support.
2. Fix it at dedicated place in the rear of right cooling bell support.
3. Remove the locking keys A and B by pushing them downwards until rupture.
4. Rotate disk C to release the station.
5. Install the finned support or the support ring.
BEFORE
Periodicity
1 month
6 months
Water (7,5 < pH < 9 and 7°F < TH < 15°F)
2 months
Don't use an air blower
Observation
34
AFTER

Advertisement

Table of Contents
loading

Table of Contents