Installation; Connections; Filling Of The Cooler - Seco PACKS EASYSHRINK 20 Operating Instructions Manual

Table of Contents

Advertisement

5.2 Installation

50 cm

5.3 Connections

5.4 Filling of the cooler

Water cooler must be localized on a stable working place, respecting a
clearance of 50 cm on both sides in order to allow air flow.
50 cm
Plug in the water pipes on the rear of the cooler (just click in).
Power supply : AC 1x230V + PE/5A/50-60Hz, cable with a DE/FR electrical plug is
supplied.
Fuse type : 6,3 A time delay
Plug in the electrical power supply cable on the rear of the cooler (don't
turn on the power yet).
Plug in electrical cable on X2 outlet of heating module: when switching on heating
module, water cooler will also start.
After installation and connection, wait minimum 3 hours before turning on the
power.
Never turn on the power without having filled the cooler before.
Open the blue cover on the top of the cooler (4 screws to release).
31

Advertisement

Table of Contents
loading

Related Products for Seco PACKS EASYSHRINK 20

Table of Contents