3.2 Connections and starting of the three-station support box
(1 operating and 2 cooling stations)

3.3 Driving of the ventilator

3.4 Driving of the cooling cycle

Three-station support box has 1 heating and cooling station and 2 cooling stations.
On completion of the heating cycle, Install the toolholder on one of the cooling station and the cooling accessories on it.
Caution, while catching the toolholders from cooling stations, they may be hot.
Always wear protective gloves while handling Shrinkfit holders, tools, accessories
and spare parts.
Power supply : AC 1x230V + PE/5A/50-60Hz, cable with a DE/FR electrical plug is
supplied.
Fuse type : 0,5 A
By first use only, plug in electrical cable on X1 outlet of heating module, switch on main
interruptor to start the support box (afterwards, driving of the support box is acieved by
using the control panel of heating module).
Ventilator driving is achieved by using the control panel of heating module.
- Press key
to switch on the ventilator.
- Press key
to switch off the ventilator.
Note : X1 outlet is only working if the control panel is switched on (press key