ABB PVS-100-TL-B-SY2 Product Manual page 73

Table of Contents

Advertisement

• Pass the phases cables trought the cable glands on the AC panel
The minimum recommended cross section for the phases conductors is 70 mm².
The cable lugs must be installed with a minimum tightening torque of 25Nm.
• Check the tightness of the AC cable glands at the end of the installation.
Make sure the cable glands are properly sealed to ensure to keep IP65 protection degree.
• Fix the phases and neutral (if required) cable
lugs to the AC connection busbars
attention to the correspondence of the phases
with the labels, using the washers and the M10
nuts pre-installed on the busbar as shown in the
following diagram:
1 = cable lug
2 = flat washer
3 = spring washer
4 = M10 nut
- 73 -
5 - Installation
.
11
, paying
21
4
3
2
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents