ABB PVS-100-TL-B-SY2 Product Manual page 64

Table of Contents

Advertisement

Final fastening operations
• To reach the two junction screws
and complete the power modu-
le and the wiring box coupling,
open the front panel of the po-
wer module and screw the two
screws as shown in the figure
• Tighten the two hexagonal jun-
ction screws
with a tightening
18
torque of 4.7 Nm.
• Tighten the two side screws
(supplied) with a tightening tor-
que of 5 Nm, to avoid the tilting
of the bottom part of the inverter.
- 64 -
5 - Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents