ABB PVS-100-TL-B-SY2 Product Manual page 59

Table of Contents

Advertisement

• Use the two M8 screws with flat
and spring washers (supplied) to
fix the pieces of the bracket to-
gether.
• Position the bracket
fectly level on the support
and use it as drilling template.
Consider the overall dimensions
of the power module and the wi-
ring box.
• It is the installer's responsibility to
choose an appropriate number
and distribution of attachment
points. The choice must be based
on the type of support (wall,
frame or other support), the type
of anchors to be used, and their
ability to support 4 times the in-
verter's weight (4x125Kg=500Kg
for all models).
• Attach the bracket
to the sup-
03
port with at least 6 attachment
screws (shown in RED) or at le-
ast 6 frame fixing bracket for fra-
me mounting (shown in BLUE).
Depending on the type of anchor
chosen, drill the required holes to
mount the bracket
. The pictu-
03
res shown the recommended mi-
nimum fixing point depending to
the type of support.
per-
03
Wall/Floor mounting
minimum fixing points
Frame mounting (3 supports)
minimum fixing points
Frame mounting (2 supports)
minimum fixing points
- 59 -
5 - Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents