ABB PVS-100-TL-B-SY2 Product Manual page 155

Table of Contents

Advertisement

The grounding kit installation is allowed only after completing all steps described in this
procedure
Earth connecting
elements
earthing and
short-circuiting
cable
14. Grounding kit installation on AC side
• Install 4 Fixed Ball Points in the AC phase R-S-T and neutral N
• Install the earth connecting elements to the earthing and short-circuiting
cable
• Connect the earthing cable to the ground
• Connect the earth connecting elements on the fixed ball points, to put
in short circuit and to ground the phase R-S-T and N.
- 155 -
8 - Maintenance

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pvs-120-tlPvs-100-tlPvs-100-tl-b-sx

Table of Contents